13.5.23. Removal and installation of the lock of a luggage carrier

1 — the luggage carrier Lock
2 — the Hinge
3 — Nuts, 8 Nanometers
4 — Draft
5 — the Cable
6 — the lock Cylinder

7 — the Bolt, 8 Nanometers
8 — the Electric motor of the uniform lock
9 — the Level
10 — the Nut, 8 Nanometers, 4 pieces.
11 — the Bolt, 2 pieces.

Sedan

Lock cylinder

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Open a luggage carrier and uncover the lock.
  2. Disunite the lock cylinder socket.
  3. Disconnect the drive (5) from the cylinder.
  4. Turn the cylinder on 90 ° and take out from a level (9).

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal. At the same time tighten a bolt (7) the moment of 8 Nanometers.
  2. Attach a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

Electric motor of the uniform lock

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Open a luggage carrier and uncover the lock.
  2. Disconnect a driving bar (4) at the electric motor (arrow A).
  3. Turn out 2 screws (11) and remove the electric motor (8) from a trunk lid.
  4. Disunite the electric motor socket.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.
  2. Attach a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

Level

Removal

 PERFORMANCE ORDER

  1. Open a luggage carrier and uncover the lock.
  2. Remove the lock cylinder, address the Section Removal and installation of the cylinder of the lock of a door.
  3. Turn off 4 nuts (10), press levels (arrows B) and take out a level upward.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal. At the same time tighten nuts the moment of 8 Nanometers.