14:29. Removal and installation of antennas

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Remove the closing roof level, address the Section Removal and installation of facing of a forward door.
  1. Disconnect lock clips (arrows on an accompanying illustration) and remove the antenna (1) from a roof.
  1. Disunite the socket (2) antennas.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.

Versatile person

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Remove a plafond of a cargo compartment, address the Section Removal and installation of plafonds of internal lighting.
  1. Remove the closing roof level, address the Section Removal and installation of facings (Station wagon).
  1. Disunite sockets (2) and (3).
  1. Turn off a nut (1) and remove the antenna from a roof.

Installation

 PERFORMANCE ORDER

  1. Further installation is carried out in the sequence, the return to removal. At the same time carry out an antenna wire through a groove in a washer of a nut (1). Join sockets according to the tags which are available on them.

Antenna of clock radios

Removal

 PERFORMANCE ORDER

  1. Remove a rear bumper, address the Section Removal and installation of facings (Station wagon).
  1. Disconnect an antenna cable (3) from the antenna (2).
  1. Turn out screws (1) and remove the antenna from the holder of a bumper.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.