14:25. Removal and installation of the switch of illumination of a ware box

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Disconnect by means of a plastic wedge or the screw-driver a cover sideways at the dashboard.
  1. Open a ware box. Disunite the socket (2), take out a finger (1), turn clockwise and remove the switch (3).

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.