13.6.3. Removal and installation of the central console

1 — the Central console
2 — the Overlay of switching
3 — the Cover
4 — Screws
5 — the Cover under the lever of the parking brake
6 — the Connecting element

7 — Screws
8 — Screws
9 — Screws
10 — Screws
11 — the Nut, 26 Nanometers
12 — Nuts, 26 Nanometers

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

  1. Tighten the parking brake.
  2. Remove facing of the lever of the parking brake, address the Section Removal and installation of facing of the lever of the parking brake.
  3. AT: Move the selector back.
  4. Uncover the lever of switching and remove the lever.
  5. Remove a forward and back ashtray, address the Section Removal and installation of an ashtray.
  6. Remove the central armrest if it is established, address the Section Removal and installation of the central armrest.
  7. Remove the radio receiver, address the Section Removal and installation of the radio receiver / the navigation device / CD changer.
  8. Remove the control panel of the heater/conditioner, address the Section Removal and installation of the control unit of the heater/conditioner.
  9. Disconnect an overlay of switching (2) from the central console, address the Section Removal and installation of the holder of drinks.
  10. Take out the right and left covers (3) from the central console and turn out fastening screws around an arrangement of legs.
  11. Take out by means of a plastic wedge a cover (5) from the central console under the lever of the parking brake.
  12. Depending on model disunite the socket of the lighter or the control unit of navigation.
  13. Turn out 2 screws of fastening (7) at a connecting element (6) and take out a connecting element.
  14. Turn out 2 screws (8) under an ashtray.
  15. Turn out 4 screws (9), and also 2 screws (10) of fastening of the central console (1).
  16. The car with the central armrest: Turn off a nut (11).
  17. Turn off 2 nuts (12).
  18. Pull the central console (1) back and remove from a floor.

The central console separates hardly.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal. At the same time nuts (11) and (12) drag on the moment of 26 Nanometers.
  2. Attach a negative cable (-) of the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.