13.6.18. Removal and installation of facings (Sedan)

 PERFORMANCE ORDER

At a detachment of cables of system of a safety cushion surely observe security measures at the address with a safety cushion, address the Section General information and security measures.

  1. To exclude operation a head safety cushion, switch off ignition and disconnect at first negative, and then positive cables of the rechargeable battery. Instructions are provided in the Section Replacement of the Rechargeable Battery.
  2. Remove the closing roof level, see below.
  1. Turn out screws (2).
  1. Remove side pillows of a back seat, address the Section Removal and installation of a back seat.
  2. Take out a clip (3) under a side pillow.
  3. Disconnect the side shelf and raise it, address appropriate section.
  4. Disconnect facing of a rack C (1) at a spring clip (4) and remove it.

Installation

 PERFORMANCE ORDER

  1. Raise the shelf and insert facing of a rack With into grooves on the shelf.
  2. Further installation is carried out in the sequence, the return to removal. At the same time replace the self-stopped screws (2) with new.

During connection of the rechargeable battery in salon there should not be people.

  1. Shoot the insulating film from the negative plug of the rechargeable battery, attach at first positive (+), and then a negative cable (-) to the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

Rack of D

Removal

 PERFORMANCE ORDER

At a detachment of cables of system of a safety cushion surely observe security measures at the address with a safety cushion, address the Section General information and security measures.

  1. To exclude operation a head safety cushion, switch off ignition and disconnect at first negative, and then positive cables of the rechargeable battery. Instructions are provided in the Section Replacement of the Rechargeable Battery.
  2. Remove facing of a rack of D, address appropriate section.
  1. Press down the handle (5) and cast away a cover of the screw (4) down. For this purpose enter a thin wire into a groove (7) and open a cover.
  1. Turn out screws (6).
  2. Turn out the screw (3) and disconnect behind facing of a rack And, address appropriate section.
  3. Extend facing (1) under facing of a rack of Century.
  4. Disconnect facing of a rack of D (1) at spring clips (2) and extend from the shelf.

Installation

 PERFORMANCE ORDER

  1. Enter into the shelf facing behind a rack of D.
  2. Insert a hook (7) in vents at facing of a rack of Page.
  3. Fix facing of a rack of D at spring clips (2).
  4. Insert forward facing under facing of a rack of Century.
  5. Check that the clip and a hook of the adapter of a safety cushion were reliably fixed.
  6. Screw the screw (3) and fix facing behind a rack And.
  7. Fix the handle by the new self-stopped screws (6). Put into place a screw cover.
  8. Put a door sealant over facing.
  9. Establish into place a roof lock level, see below.

During connection of the rechargeable battery in salon there should not be people.

  1. Shoot the insulating film from the negative plug of the rechargeable battery, attach at first positive (+), and then a negative cable (-) to the rechargeable battery.

Observe indications of the Section Replacement of the Rechargeable Battery.

The closing roof level

Removal

 PERFORMANCE ORDER

  1. Disconnect the closing level of a roof (1) at spring clips (2) from grooves (3) and remove.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.

Back entrance level

Removal

 PERFORMANCE ORDER

  1. Remove the lower facing of a rack In, address the Section Removal and installation of the lower facing of a rack of Century.
  2. Remove facing of a rack of Page.
  3. Remove a side pillow of a back seat, address the Section Removal and installation of a back seat.
  4. Disconnect an entrance level at three spring clips and remove.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.

Shelf

Removal

 PERFORMANCE ORDER

  1. Depending on the equipment: Cast away a back of a back seat or remove, address the Section Removal and installation of a back seat.
  2. Disconnect from the shelf facing of a rack With at the left and on the right.
  3. Remove the left and right side pillows of a back seat, address the Section Removal and installation of a back seat.
  4. Not leaning back back seat: Disconnect below the central seat belt.
  1. Remove from the shelf by means of a plastic wedge a lattice of a loudspeaker (3).
  1. Depending on the equipment turn out 3 or 4 screws (4).
  2. Turn out from below 3 screws of fastening of solar blinds in a luggage carrier and extend a curtain forward.
  3. Pull the shelf (1) (shooter) forward, disconnect at an edge (2) and take out upward.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.

Side facing of a luggage carrier

Removal

 PERFORMANCE ORDER

  1. Open a luggage carrier and take out a floor cover.
  2. Remove facing of overlapping of a back.
  3. Remove a back of a back seat, address the Section Removal and installation of a back seat.
  4. Turn out bolts of fastening of eyes of a luggage carrier.
  5. Disconnect side facing at four spring clips above and behind and remove up. If it is necessary, previously open a sidewall cover in facing.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal. At the same time put a sealant of a door over facing.

Overlapping of a back

Removal

 PERFORMANCE ORDER

  1. Open a luggage carrier and take out a floor cover.
  1. Turn off 2 nuts (2), if necessary, take out a spare wheel.
  1. Disunite the luggage carrier lighting lamp socket.
  2. Disconnect facing of overlapping of a back (1) in four spring clips (3) and remove overlapping.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal.