4.6.4. Removal and installation of a belt of the drive of auxiliary units

1 — Klinova a belt
2 — the Bolt, 23 Nanometers
3 — the Generator
4 — the Bolt, 45 Nanometers
5 — the Bolt, 23 Nanometers
6 — the Holder of the generator
7 — the Screw, 40 Nanometers
8 — the tension Device
9 — the Screw, 23 Nanometers
10 — the Pulley of the pump of the hydraulic booster
11 — the Sealing ring. Surely replace
12 — the Hollow bolt, 47 Nanometers
13 — the Pressure head pipeline for the power steering pump
14 — the power steering Pump

15 — the Holder of the pump
16 — the Bolt, 23 Nanometers
17 — the Bolt, 23 Nanometers
18 — the Holder of the compressor of the conditioner
19 — the Bolt, 23 Nanometers
20 — the Nut, 23 Nanometers
21 — the Bolt, 25 Nanometers
22 — the Compressor. Attention: Do not turn off/disconnect pipelines of cooling liquid. After removal fix the compressor by a wire on a body. Do not suspend it for pipelines
23 — compressor Plugs
24 — the Pulley of a bent shaft (a damper of tortional fluctuations)
Depending on a year of release with a persistent washer or without it between a damper of tortional fluctuations (a pulley of a bent shaft) and a wheel of a gear belt.
25 — the Bolt, 23 Nanometers
26 — the Bolt, 23 Nanometers

Scheme of laying remnya.6-cylinder petrol engine

1 — the Generator
2 — Klinova a belt
3 — the power steering Pump

4 — the Compressor
5 — the Bent shaft
6 — the Tension roller

Removal

 PERFORMANCE ORDER

  1. Remove all top covers of the engine. Disconnect the electromagnetic valve of an adsorber of the fulfilled gases and remove a forward right air duct.
  2. Mark with chalk or a felt-tip pen the direction of rotation on a maple belt.

Change of the direction of rotation of a belt, already former in work, can lead to its gap.

  1. Weaken maple a belt and take off it. For this purpose incline the tension device the suitable lever, for example, 3299/3299/1 in the direction of rotation.

Installation

 PERFORMANCE ORDER

  1. Installation is carried out in the sequence, the return to removal. At the same time at first put on maple a belt a pulley of a bent shaft and then a tension roller.